ASME B30.18-2021

  • standard by ASME International, 09/30/2021
  • Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)
  • Category: ASME

$59.00 $30.00

Full Description

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

Product Details

Published:
09/30/2021
ISBN(s):
9780791874653
ANSI:
ANSI Approved
Number of Pages:
38
File Size:
1 file , 460 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus

Document History

ASME B30.18-2021

ASME B30.18-2016

ASME B30.18-2011

ASME B30.18-2004 (R2009)

ASME B30.18-1998

ASME BPVC-IID-2007 Metric

ASME BPVC-IID-2007 Metric

2007 ASME Boiler and Pressure Vessel Code, Section II: Materials - Part D: Properties (Metric), Incl..

$142.00 $212.00

ASME BPVC-III NCA-2007

ASME BPVC-III NCA-2007

2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plan..

$77.00 $126.00

ASME BPVC-III ND-2007

ASME BPVC-III ND-2007

2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plan..

$99.00 $191.00

ASME BPVC-III NE-2007

ASME BPVC-III NE-2007

2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plan..

$104.00 $181.00