PIP CVS02100
- standard by Process Industry Practices, 12/01/2021
- Site Preparation, Excavation, and Backfill Specification [Technical Revision]
- Category: PIP
$100.00
$50.00
Full Description
This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.
Product Details
- Published:
- 12/01/2021
- Number of Pages:
- 19
- File Size:
- 1 file , 380 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus
Document History