PIP CVS02100

  • standard by Process Industry Practices, 12/01/2021
  • Site Preparation, Excavation, and Backfill Specification [Technical Revision]
  • Category: PIP

$100.00 $50.00

Full Description

This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.

Product Details

Published:
12/01/2021
Number of Pages:
19
File Size:
1 file , 380 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus

Document History

PIP CVS02100

PIP CVS02100

PIP CVS02100

PIP CVS02100

PIP CVS02100

PIP CVS02100

PIP PN01PP0H01

PIP PN01PP0H01

Piping Material Specification 1PP0H01 Class 150, Polypropylene (Copolymer), 0.000" C.A. Process..

$130.00 $259.00

PIP PN09SJ0S01

PIP PN09SJ0S01

Piping Material Specification 9SJ0S01 Class 900, 321 Stainless Steel, 0.000" C.A. Process..

$38.00 $75.00

PIP PN09SJ1S01

PIP PN09SJ1S01

Piping Material Specification 9SJ1S01 Class 900, 321 Stainless Steel, 0.063" C.A. Process..

$38.00 $75.00

PIP PCTPA001

PIP PCTPA001

Process Analyzer System Acceptance Testing..

$50.00 $100.00