• PIP PCFTE100

PIP PCFTE100

  • standard by Process Industry Practices, 07/01/2008
  • Thermowell Fabrication Details [New Practice]
  • Category: PIP

$100.00 $50.00

Full Description

This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells.

Product Details

Published:
07/01/2008
Number of Pages:
8
File Size:
1 file , 310 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus

Document History

PIP PCFTE100

PIP PCFTE100

PIP PN01CL1S01

PIP PN01CL1S01

Piping Material Specification 1CL1S01 Class 150, 5 CR - 1/2 MO, 0.063" C.A. Process..

$38.00 $75.00

PIP PN09CL1S01

PIP PN09CL1S01

Piping Material Specification 9CL1S01, Class 900, 5 CR - 1/2 MO, 0.063" C.A. Process..

$38.00 $75.00

PIP PN01CK1S01

PIP PN01CK1S01

Piping Material Specification 1CK1S01 Class 150, 2-1/4 CR - 1 MO, 0.063" C.A. Process..

$38.00 $75.00

PIP PN12CS1G01

PIP PN12CS1G01

Piping Material Specification 12CS1G01, Class 125, Carbon Steel, 0.063" C.A., Utility (Air & Water),..

$38.00 $75.00